Call Us: 321-328-5444

Projects

Project categories

Work Flow Design

At a global Food Supply organization, responsible for increasing efficiency of Fruit packing line.  Using tools including time study, video analysis and process mapping, was able to identify more efficient design for packing cut fruit into small CPG containers.  Went from a continuous assembly line to a U shaped work cell.  Productivity increase was 300%.